Skip to main content
300–1000 m³/h

Output Capacity

±1%

Cement Accuracy

Full PLC

Automation Level

Detalhes do produto

The WBZ300–600 stabilized soil mixing plant features a continuous twin-shaft compulsory mixing system designed for high-capacity and efficient production of stabilized soil materials. With an output range of 300–600 t/h, the plant is widely used in highway base construction, municipal road projects, airport runways, and large-scale infrastructure developments.

Equipped with a high-precision electronic weighing system, the WBZ series ensures accurate material proportioning and consistent aggregate gradation to meet demanding road construction standards. The continuous mixing process delivers uniform material quality, stable performance, and high production efficiency for large-volume operations.

Designed with a modular structure and advanced automatic control system, the plant offers reliable operation, easy maintenance, convenient installation, and strong adaptability to different working conditions. Combining high productivity, precise batching, and durable construction, the WBZ300–600 series is an ideal solution for modern stabilized soil and road base material production projects.

Série WBZ Estacionária
0+

Configurações disponíveis

Sobre WBZ

Continuous High-Volume Soil Stabilization

WBZ series delivers precise lime/cement-stabilized soil for highway subgrade and airport runway base. Continuous twin-shaft mixing with automated metering ensures consistent strength grade across high-volume outputs of 300–1000 m³/h.

Batching Accuracy
±0.5%
On-Time Delivery
96%
Compliance Standards

Certificações e conformidade

ISO-9001

CE

Como trabalhamos

Da consulta à colocação em operação

01

Tell us about the project

Share your required output, site conditions, power supply and target budget.

02

Engineering proposal

Our engineers return a plant layout, configuration list and quotation, usually within 24 hours.

03

Contract and production

Production starts on order confirmation; you receive progress photos at every major stage.

04

Factory testing

Every unit is assembled and test-run before shipment, with a written inspection report.

05

Shipping and installation

We handle export documentation and dispatch engineers for on-site installation and commissioning.

06

Training and after-sales

Operator training, spare-parts supply and remote technical support for the life of the plant.

Projetos reais

Casos de instalação no mundo

Avaliações de clientes

O que dizem nossos clientes

Ahmed Hassan

Ahmed Hassan

Project Manager

The HZS120 plant has been running 18 hours a day for 2 years. Zero major breakdowns. The control system is incredibly precise, saving us 5% on cement costs.

Robert Chen

Robert Chen

Operations Director

We replaced our old Italian mixers with Xingye's Twin-Shaft JS3000. The mixing homogeneity is identical, but the maintenance cost is 40% lower.

David Osei

David Osei

Site Engineer

Installation was surprisingly fast. The engineers arrived on time and had the 60m³/h plant running in just 10 days. Great training for our local team.

Viktor Petroff

Viktor Petroff

CEO

We need equipment that works in -20°C winters. Xingye's heating system and insulated cladding performed perfectly. A reliable partner for harsh climates.

Série WBZ Estacionária
Perguntas frequentes

Perguntas frequentes sobre Série WBZ Estacionária

WBZ plants process cement-stabilized soil, lime-stabilized soil, gravel-soil mixtures, fly ash composite stabilized bases, and recycled aggregate mixes for highway and airport base layers.

The WBZ600 achieves a continuous output of 600 m³/h under standard conditions with 5% cement content and normal soil moisture. Output varies with material gradation and moisture content.

The screw conveyor and weighing system achieves cement dosing accuracy of ±1%, meeting Chinese JTG/T F20 highway base stabilization standards.

Yes. Standard equipment includes a dust collection system on the mixer head and cement inlet. A secondary bag filter is available as an option for stricter environmental requirements.

WBZ stationary plants require a reinforced concrete foundation pad. Our engineers provide foundation design drawings based on your soil survey data. Foundation construction typically takes 10–20 days.

Get in Touch

Request a Quote

Tell us your capacity needs — we'll recommend the right equipment and send a detailed proposal within 24 hours.

Send Us a Message