Output Capacity
Cement Accuracy
Automation Level
产品详情
为真实工况而设计
可选配置
Continuous High-Volume Soil Stabilization
WBZ series delivers precise lime/cement-stabilized soil for highway subgrade and airport runway base. Continuous twin-shaft mixing with automated metering ensures consistent strength grade across high-volume outputs of 300–1000 m³/h.
资质认证
ISO-9001
CE
从咨询到交付调试
Tell us about the project
Share your required output, site conditions, power supply and target budget.
Engineering proposal
Our engineers return a plant layout, configuration list and quotation, usually within 24 hours.
Contract and production
Production starts on order confirmation; you receive progress photos at every major stage.
Factory testing
Every unit is assembled and test-run before shipment, with a written inspection report.
Shipping and installation
We handle export documentation and dispatch engineers for on-site installation and commissioning.
Training and after-sales
Operator training, spare-parts supply and remote technical support for the life of the plant.
全球安装案例
客户怎么说
WBZ 连续式稳定土拌合站系列 常见问题
WBZ plants process cement-stabilized soil, lime-stabilized soil, gravel-soil mixtures, fly ash composite stabilized bases, and recycled aggregate mixes for highway and airport base layers.
The WBZ600 achieves a continuous output of 600 m³/h under standard conditions with 5% cement content and normal soil moisture. Output varies with material gradation and moisture content.
The screw conveyor and weighing system achieves cement dosing accuracy of ±1%, meeting Chinese JTG/T F20 highway base stabilization standards.
Yes. Standard equipment includes a dust collection system on the mixer head and cement inlet. A secondary bag filter is available as an option for stricter environmental requirements.
WBZ stationary plants require a reinforced concrete foundation pad. Our engineers provide foundation design drawings based on your soil survey data. Foundation construction typically takes 10–20 days.
获取报价
告诉我们您的产能需求,我们会为您推荐合适设备,并在 24 小时内提供详细方案。