Skip to main content

Stationary Concrete Batching Plant

HZS stationary concrete batching plants are fixed concrete batch plant systems for 50–120 m³/h ready mix and infrastructure production. The series combines JS twin-shaft mixers, PLD aggregate batching machines, cement silos, screw conveyors, belt conveyor or skip hoist feeding, and fully automatic PLC control for stable commercial concrete output.

Stationary Concrete Batching Plant
±0.5%

Mixing Accuracy

98%

Uptime Reliability

PLC Auto

Control Precision

Available Models

Choose the right capacity for your project requirements. 5 Models

HZS60 Stationary Concrete Batching Plant

HZS60

HZS60 Stationary Concrete Batching Plant

High-performance stationary plant with 60 m³/h output. Features the powerful JS1000 twin-shaft mixer, intelligent weighing system, and fully enclosed environmental design. Built for large-scale infrastructure and commercial concrete production.

HZS90 Stationary Concrete Batching Plant

HZS90

HZS90 Stationary Concrete Batching Plant

A 90m³ stationary concrete mixing plant is a facility installed at a specific location and does not change its location as the construction project moves. Stationary concrete mixing plant provides a continuous and stable supply of concrete for large construction projects or construction sites with long-term concrete needs, with the characteristics of stable production capacity and high efficiency.

HZS180 Stationary Concrete Batching Plant

HZS180

HZS180 Stationary Concrete Batching Plant

High-performance stationary plant with 180 m³/h output. Features the powerful JS3000 twin-shaft mixer, intelligent weighing system, and fully enclosed environmental design. Built for large-scale infrastructure and commercial concrete production.

Stationary Concrete Batching Plant
5+

Available Configurations

About the HZS / 2HZS

Industrial-Grade Output for Large-Scale Projects

HZS series stationary plants deliver consistent, high-volume concrete for ready-mix producers and major infrastructure contractors. Twin-shaft JS mixers ensure uniform mixing at every batch from 25 to 240 m³/h.

Batching Accuracy
±0.5%
On-Time Delivery
96%
Compliance Standards

Certifications & Compliance

CE

ISO-9001

How We Work

From Enquiry to Commissioning

01

Tell us about the project

Share your required output, site conditions, power supply and target budget.

02

Engineering proposal

Our engineers return a plant layout, configuration list and quotation, usually within 24 hours.

03

Contract and production

Production starts on order confirmation; you receive progress photos at every major stage.

04

Factory testing

Every unit is assembled and test-run before shipment, with a written inspection report.

05

Shipping and installation

We handle export documentation and dispatch engineers for on-site installation and commissioning.

06

Training and after-sales

Operator training, spare-parts supply and remote technical support for the life of the plant.

Real Projects

Global Installation Cases

Customer Reviews

What Our Clients Say

Ahmed Hassan

Ahmed Hassan

Project Manager

The HZS120 plant has been running 18 hours a day for 2 years. Zero major breakdowns. The control system is incredibly precise, saving us 5% on cement costs.

Robert Chen

Robert Chen

Operations Director

We replaced our old Italian mixers with Xingye's Twin-Shaft JS3000. The mixing homogeneity is identical, but the maintenance cost is 40% lower.

David Osei

David Osei

Site Engineer

Installation was surprisingly fast. The engineers arrived on time and had the 60m³/h plant running in just 10 days. Great training for our local team.

Viktor Petroff

Viktor Petroff

CEO

We need equipment that works in -20°C winters. Xingye's heating system and insulated cladding performed perfectly. A reliable partner for harsh climates.

Stationary Concrete Batching Plant
Common Questions

Stationary Concrete Batching Plant FAQ

HZS stationary plants require a reinforced concrete foundation. Our engineers provide foundation drawings tailored to your soil bearing capacity. Typical foundation preparation takes 7–14 days.

The HZS120 completes one mixing cycle in approximately 72 seconds using a JS2000 twin-shaft mixer, achieving a real-world output of approximately 90–100 m³/h under standard conditions.

Standard configurations include 1–2 cement silos. Up to 4 silos can be connected with extended piping. Silo capacities range from 100T to 1000T depending on project storage requirements.

Yes. The PLC system stores 50+ mix recipes, supports automatic and manual modes, generates production reports, and can integrate with weighbridge or ERP systems via Modbus.

Standard HZS120 plants are completed and ready to ship within 30–45 days of order confirmation. Custom configurations may require 45–60 days.

Get in Touch

Request a Quote

Tell us your capacity needs — we'll recommend the right equipment and send a detailed proposal within 24 hours.

Send Us a Message