60 m³/h

Production Capacity

3 Models

Available Configurations

24 mo

Standard Warranty

40 +

Countries Installed

Available Models

Choose the right capacity for your project requirements. 3 Models

YHZS75 Mobile Concrete Batching Plant

YHZS75 Mobile Concrete Batching Plant

YHZS75 Mobile Concrete Batching Plant

Trailer-mounted mobile concrete batching plant with 75 m³/h capacity. Designed for rapid deployment with a plug-and-play setup, requiring no deep foundations. Ideal for road, bridge, and remote construction projects.

YHZS Wheeled Mobile Concrete Batching Plant Series
3+

Models Available

About the YHZS Series

Foundation-Free. Deploy Anywhere in 3 Days.

No civil works required. Full installation in 2–3 days by a 4-person crew using standard tools. ISO 9001 certified mixing accuracy to ±0.5%. Designed for projects where speed and flexibility are critical.

Mixing Accuracy
±0.5%
On-Time Delivery
96%
Install Time
3 Days
Real Projects

Global Installation Cases

Customer Reviews

What Our Clients Say

Ahmed Hassan
Ahmed Hassan
Project Manager

The HZS120 plant has been running 18 hours a day for 2 years. Zero major breakdowns. The control system is incredibly precise, saving us 5% on cement costs.

Robert Chen
Robert Chen
Operations Director

We replaced our old Italian mixers with Xingye's Twin-Shaft JS3000. The mixing homogeneity is identical, but the maintenance cost is 40% lower.

David Osei
David Osei
Site Engineer

Installation was surprisingly fast. The engineers arrived on time and had the 60m³/h plant running in just 10 days. Great training for our local team.

Viktor Petroff
Viktor Petroff
CEO

We need equipment that works in -20°C winters. Xingye's heating system and insulated cladding performed perfectly. A reliable partner for harsh climates.

YHZS Wheeled Mobile Concrete Batching Plant Series
Common Questions

YHZS Wheeled Mobile Concrete Batching Plant Series FAQ

1. Does the YHZS series require a concrete foundation?

No. The YHZS series uses a bolted steel frame structure that sits directly on leveled ground. No concrete foundation works are required, which significantly reduces installation cost and time.

A standard YHZS50 can be fully installed and commissioned in 2–3 working days by a 4-person crew with standard tools. Larger models (YHZS75–YHZS100) typically take 3–5 days.

Yes. The plant is designed for repeated relocation. Disassembly takes approximately 1–2 days. All structural components are bolted, not welded, so no cutting equipment is needed.

All YHZS plants include a fully automated PLC control system with touchscreen interface, batching recipe storage (50+ mix designs), real-time production logging, and remote diagnostics capability.

All YHZS plants include a 24-month warranty, 2-hour remote response SLA, 7-day spare parts delivery to port, and online video commissioning support. On-site engineering service is available at additional cost.

Yes. Cold-climate options include heated aggregate bins, insulated water heating system, and freeze-resistant electrical enclosures, suitable for environments down to -30°C.

Get in Touch

Request a Quote

Tell us your capacity needs — we'll recommend the right equipment and send a detailed proposal within 24 hours.

Send Us a Message