Skip to main content
40 +

Countries Installed

Product Details

Double your output. Minimize downtime risks.
Available in parallel twin-unit configurations from 90+90 to 120+120 m³/h, the 2HZS batching plant features a built-in redundant system that keeps up to 50% production running even during maintenance or unexpected shutdowns of one unit. Engineered for uninterrupted concrete supply, it is the ideal solution for nuclear power plants, dam construction, airports, highways, and other large-scale infrastructure projects requiring continuous pouring operations.

2HZS Double-Line Concrete Batching Plant Series
0+

Available Configurations

About the 2*HZS

Built for Global Project Conditions

ISO 9001 and CE certified. Every unit undergoes 100% pre-shipment testing, and is designed for straightforward installation, reliable long-term operation, and responsive after-sales support in over 40 countries.

Batching Accuracy
±0.5%
On-Time Delivery
96%
Compliance Standards

Certifications & Compliance

ISO-9001

CE

How We Work

From Enquiry to Commissioning

01

Tell us about the project

Share your required output, site conditions, power supply and target budget.

02

Engineering proposal

Our engineers return a plant layout, configuration list and quotation, usually within 24 hours.

03

Contract and production

Production starts on order confirmation; you receive progress photos at every major stage.

04

Factory testing

Every unit is assembled and test-run before shipment, with a written inspection report.

05

Shipping and installation

We handle export documentation and dispatch engineers for on-site installation and commissioning.

06

Training and after-sales

Operator training, spare-parts supply and remote technical support for the life of the plant.

Real Projects

Global Installation Cases

Customer Reviews

What Our Clients Say

Ahmed Hassan

Ahmed Hassan

Project Manager

The HZS120 plant has been running 18 hours a day for 2 years. Zero major breakdowns. The control system is incredibly precise, saving us 5% on cement costs.

Robert Chen

Robert Chen

Operations Director

We replaced our old Italian mixers with Xingye's Twin-Shaft JS3000. The mixing homogeneity is identical, but the maintenance cost is 40% lower.

David Osei

David Osei

Site Engineer

Installation was surprisingly fast. The engineers arrived on time and had the 60m³/h plant running in just 10 days. Great training for our local team.

Viktor Petroff

Viktor Petroff

CEO

We need equipment that works in -20°C winters. Xingye's heating system and insulated cladding performed perfectly. A reliable partner for harsh climates.

Get in Touch

Request a Quote

Tell us your capacity needs — we'll recommend the right equipment and send a detailed proposal within 24 hours.

Send Us a Message