Skip to main content
Custom

Production Capacity

3 Models

Available Configurations

24 mo

Standard Warranty

40 +

Countries Installed

Available Models

Scegli la capacità giusta per le esigenze del tuo progetto. 3 Modelli

JS3000 Heavy-Duty Twin-Shaft Forced Mixer

JS3000 Heavy-Duty Twin-Shaft Forced Mixer

JS3000 Heavy-Duty Twin-Shaft Forced Mixer

Heavy-duty 3.0 m³ twin-shaft mixer. Designed for flagship HZS180 plants and large infrastructure. Features high-pressure floating seals and high-chromium alloy liners for continuous, high-viscosity mixing.

Mescolatore Forzato a Doppio Asse JS500

Mescolatore Forzato a Doppio Asse JS500

Mescolatore Forzato a Doppio Asse JS500

Mescolatore a doppio asse ad alte prestazioni con capacità di 0.5 m³ per ciclo. Dotato di tenuta dell'estremità dell'albero multistrato e rivestimenti in lega ad alta resistenza all'usura per oltre 10.000 ore di funzionamento affidabile.

Technical Specifications

Model Comparison

Parameter JS1500 Twin-Shaft Forced Concrete MixerJS3000 Heavy-Duty Twin-Shaft Forced Mixer
Discharge Volume 1500 L (1.5 m³)-
Feeding Volume 2400 L4800 L
Theoretical Productivity ≥ 75 m³/h≥ 150 m³/h
Mixer Motor Power 2 × 30 kW2 × 55 kW (Heavy-Duty Dual Motors)
Max Aggregate Size Pebble 80mm / Crushed Stone 60mmPebble 80mm / Crushed Stone 60mm
Discharge Mode Pneumatic / HydraulicHydraulic (Adjustable Angle)
Number of Blades 2 × 7 (Optimized attack angle)2 × 8
Total Weight ~ 6800 kg-
Discharge Volume (Per Batch) -3000 L (3.0 m³)
Reference Weight -~ 11,500 kg
Dimensions (L×W×H) -~ 3500 × 2400 × 2300 mm
Serie JS-H — Mescolatori con Scarico Idraulico
3+

Models Available

About the JS-H Series

Built for Global Project Conditions

ISO 9001 & CE certified. Every unit undergoes 100% pre-shipment testing. Designed for straightforward installation, reliable long-term operation, and responsive after-sales support in over 40 countries.

Quality Certified
ISO 9001 · CE
On-Time Delivery
96%
Countries Served
40+

Dettagli prodotto

Equipped with premium JS1000H to JS3000H twin-shaft mixers, this heavy-duty batching solution is engineered for high-output commercial concrete production. The hydraulic gate opening system delivers faster and cleaner discharge, increasing unloading efficiency while significantly reducing residue buildup and material leakage. Compared with traditional pneumatic systems, it offers more reliable sealing performance, smoother operation, and lower maintenance requirements. Designed for continuous heavy-load operation, the system ensures stable mixing performance, improved production efficiency, and long-term durability for commercial concrete plants and large-scale infrastructure projects.

 
 
Real Projects

Global Installation Cases

Customer Reviews

What Our Clients Say

Ahmed Hassan

Ahmed Hassan

Project Manager

The HZS120 plant has been running 18 hours a day for 2 years. Zero major breakdowns. The control system is incredibly precise, saving us 5% on cement costs.

Robert Chen

Robert Chen

Operations Director

We replaced our old Italian mixers with Xingye's Twin-Shaft JS3000. The mixing homogeneity is identical, but the maintenance cost is 40% lower.

David Osei

David Osei

Site Engineer

Installation was surprisingly fast. The engineers arrived on time and had the 60m³/h plant running in just 10 days. Great training for our local team.

Viktor Petroff

Viktor Petroff

CEO

We need equipment that works in -20°C winters. Xingye's heating system and insulated cladding performed perfectly. A reliable partner for harsh climates.

Serie JS-H — Mescolatori con Scarico Idraulico
Common Questions

Serie JS-H — Mescolatori con Scarico Idraulico FAQ

All Xingye equipment includes a 24-month warranty covering manufacturing defects in materials and workmanship. Extended warranty options are available upon request.

Yes. Our engineers travel worldwide for on-site installation, commissioning, and operator training. We provide complete documentation including installation drawings, commissioning reports, and operator manuals.

Standard configurations are completed and ready to ship within 30–45 days after order confirmation. Custom configurations or larger equipment may require 45–60 days.

All equipment is manufactured to ISO 9001 quality management standards and holds CE marking for export to European and international markets. CNAS laboratory certification covers our testing facilities.

We provide 2-hour remote response for technical issues, 7-day spare parts delivery to port, online video commissioning support, and on-site engineering service. Our team covers all major time zones.

Get in Touch

Request a Quote

Tell us your capacity needs — we'll recommend the right equipment and send a detailed proposal within 24 hours.

Send Us a Message