Skip to main content
40 +

Países com instalações

Detalhes do produto

Equipped with premium JS1000H to JS3000H twin-shaft mixers, this heavy-duty batching solution is engineered for high-output commercial concrete production. The hydraulic gate opening system delivers faster and cleaner discharge, increasing unloading efficiency while significantly reducing residue buildup and material leakage. Compared with traditional pneumatic systems, it offers more reliable sealing performance, smoother operation, and lower maintenance requirements. Designed for continuous heavy-load operation, the system ensures stable mixing performance, improved production efficiency, and long-term durability for commercial concrete plants and large-scale infrastructure projects.

 
 
Série JS Hidráulica
0+

Configurações disponíveis

Sobre JS-H

Construído para obras no mundo todo

Certificação ISO 9001 e CE. Cada unidade passa por testes 100% antes do embarque e foi projetada para instalação simples, operação confiável a longo prazo e suporte pós-venda ágil em mais de 40 países.

Batching Accuracy
±0.5%
On-Time Delivery
96%
Compliance Standards

Certificações e conformidade

ISO-9001

CE

SGS

Como trabalhamos

Da consulta à colocação em operação

01

Tell us about the project

Share your required output, site conditions, power supply and target budget.

02

Engineering proposal

Our engineers return a plant layout, configuration list and quotation, usually within 24 hours.

03

Contract and production

Production starts on order confirmation; you receive progress photos at every major stage.

04

Factory testing

Every unit is assembled and test-run before shipment, with a written inspection report.

05

Shipping and installation

We handle export documentation and dispatch engineers for on-site installation and commissioning.

06

Training and after-sales

Operator training, spare-parts supply and remote technical support for the life of the plant.

Projetos reais

Casos de instalação no mundo

Avaliações de clientes

O que dizem nossos clientes

Ahmed Hassan

Ahmed Hassan

Project Manager

The HZS120 plant has been running 18 hours a day for 2 years. Zero major breakdowns. The control system is incredibly precise, saving us 5% on cement costs.

Robert Chen

Robert Chen

Operations Director

We replaced our old Italian mixers with Xingye's Twin-Shaft JS3000. The mixing homogeneity is identical, but the maintenance cost is 40% lower.

David Osei

David Osei

Site Engineer

Installation was surprisingly fast. The engineers arrived on time and had the 60m³/h plant running in just 10 days. Great training for our local team.

Viktor Petroff

Viktor Petroff

CEO

We need equipment that works in -20°C winters. Xingye's heating system and insulated cladding performed perfectly. A reliable partner for harsh climates.

Get in Touch

Request a Quote

Tell us your capacity needs — we'll recommend the right equipment and send a detailed proposal within 24 hours.

Send Us a Message