Civil Cost Saving
Mixing Accuracy
Setup Time
Detail Produk
25–90m³/h foundation-free concrete batching plants are specially designed for construction projects requiring frequent relocation and rapid deployment. Featuring a highly integrated modular structure, the plant can be quickly installed, commissioned, and put into operation after basic ground leveling and site preparation, significantly reducing installation time and infrastructure costs.
Engineered for mobility and efficiency, the entire system is optimized for standard container transportation, making overseas shipping and cross-border project deployment more convenient and cost-effective. Its compact design, fast assembly capability, and flexible transportation advantages make it an ideal solution for road construction, bridge projects, temporary engineering sites, and international contracting projects requiring efficient concrete production in multiple locations.
Model yang Tersedia
Pilih kapasitas yang tepat sesuai dengan kebutuhan proyek Anda. 1 Model
HZS90
Batching Plant Beton Bebas Pondasi HZS90 (90 m³/h)
Batching plant beton modular HZS90 tanpa pondasi sipil berkapasitas 90 m³/h, mixer forced twin-shaft JS1500, perakitan cepat container-friendly.
Perbandingan Model
| Seri | Kapasitas Produksi Teoritis | Model Mesin Mixer | Kapasitas Mesin Batching | Tinggi Pembongkaran (Discharge Height) |
|---|---|---|---|---|
| HZS90 | 90 m³/h | JS1500 Forced Twin-Shaft (1.5 m³ per batch) | PLD2400 (3 Bin / 2.4 m³) | 3.8 / 4.0 Meter |
Dirancang untuk Kondisi Proyek Nyata
Konfigurasi Tersedia
Stationary Performance Without Foundation Cost
Foundation-free HZS plants deliver the output of a stationary plant with 70% less civil preparation. Steel base frame eliminates concrete foundation works while maintaining full production accuracy.
Sertifikasi dan Kepatuhan
CE
ISO-9001
Dari Konsultasi hingga Commissioning
Tell us about the project
Share your required output, site conditions, power supply and target budget.
Engineering proposal
Our engineers return a plant layout, configuration list and quotation, usually within 24 hours.
Contract and production
Production starts on order confirmation; you receive progress photos at every major stage.
Factory testing
Every unit is assembled and test-run before shipment, with a written inspection report.
Shipping and installation
We handle export documentation and dispatch engineers for on-site installation and commissioning.
Training and after-sales
Operator training, spare-parts supply and remote technical support for the life of the plant.
Kasus Instalasi Global
Apa Kata Klien Kami
Minta Penawaran
Beri tahu kami kebutuhan kapasitas Anda — kami akan merekomendasikan peralatan yang tepat dan mengirimkan penawaran detail dalam waktu 24 jam.