Skip to main content
~70%

Civil Cost Saving

±0.5%

Mixing Accuracy

4–5 Days

Setup Time

产品详情

25–90方免基础混凝土搅拌站专为高频转场及快速施工需求而设计,广泛适用于道路工程、桥梁建设、临时施工项目及海外工程建设。设备采用免基础模块化结构设计,场地简单硬化后即可快速安装、联调并投入生产,大幅缩短建站周期,降低土建基础投入成本。

整机集成度高,结构紧凑,运输与拆装便捷,可完美适配标准集装箱运输,有效降低海运成本及跨国项目物流费用,特别适合中资海外工程项目及流动性较强的施工环境。

设备具备安装效率高、转场速度快、自动化程度高及运行稳定等优势,可满足25–90m³/h混凝土连续生产需求,是现代工程项目实现灵活部署与高效施工的理想混凝土搅拌设备。

可选型号

按项目产能需求选择合适机型,共 1 款机型

HZS90 免基础混凝土搅拌站

HZS90

HZS90 免基础混凝土搅拌站

免基础混凝土搅拌站,时产 90 立方米。无需昂贵的混凝土基础,最多可节省60%的土建成本和安装时间。非常适合临时工地。

HZS 免基础快装搅拌站系列
1+

可选配置

关于HZS

Stationary Performance Without Foundation Cost

Foundation-free HZS plants deliver the output of a stationary plant with 70% less civil preparation. Steel base frame eliminates concrete foundation works while maintaining full production accuracy.

Batching Accuracy
±0.5%
On-Time Delivery
96%
Compliance Standards

资质认证

CE

ISO-9001

服务流程

从咨询到交付调试

01

Tell us about the project

Share your required output, site conditions, power supply and target budget.

02

Engineering proposal

Our engineers return a plant layout, configuration list and quotation, usually within 24 hours.

03

Contract and production

Production starts on order confirmation; you receive progress photos at every major stage.

04

Factory testing

Every unit is assembled and test-run before shipment, with a written inspection report.

05

Shipping and installation

We handle export documentation and dispatch engineers for on-site installation and commissioning.

06

Training and after-sales

Operator training, spare-parts supply and remote technical support for the life of the plant.

工程实例

全球安装案例

客户评价

客户怎么说

Ahmed Hassan

Ahmed Hassan

Project Manager

The HZS120 plant has been running 18 hours a day for 2 years. Zero major breakdowns. The control system is incredibly precise, saving us 5% on cement costs.

Robert Chen

Robert Chen

Operations Director

We replaced our old Italian mixers with Xingye's Twin-Shaft JS3000. The mixing homogeneity is identical, but the maintenance cost is 40% lower.

David Osei

David Osei

Site Engineer

Installation was surprisingly fast. The engineers arrived on time and had the 60m³/h plant running in just 10 days. Great training for our local team.

Viktor Petroff

Viktor Petroff

CEO

We need equipment that works in -20°C winters. Xingye's heating system and insulated cladding performed perfectly. A reliable partner for harsh climates.

联系我们

获取报价

告诉我们您的产能需求,我们会为您推荐合适设备,并在 24 小时内提供详细方案。

给我们留言