What materials can the WBZ plant process?
WBZ plants process cement-stabilized soil, lime-stabilized soil, gravel-soil mixtures, fly ash composite stabilized bases, and recycled aggregate mixes for highway and airport base layers.
WBZ600 Stationary Stabilized Soil Mixing Plant
时产 600 吨的“水稳王者”。采用无衬板双卧轴连续强制搅拌与动态皮带秤计量,专为高速公路及机场跑道路基建设提供不间断、高精度的稳定土材料支撑。适配标准集装箱发运。
| 理论生产率 | 600 t/h (吨/小时) |
|---|---|
| 搅拌机形式 | 双卧轴连续式强制搅拌机 |
| 配料系统形式 | 模块化电子皮带秤 (变频调速) |
| 配料仓数量 | 3-5 仓可选 |
| 动态称重精度 | 骨料 ≤2% / 粉料及水 ≤1% |
| 总装机功率 | 约 135 kW |
| 成品储料仓容量 | 8m³ 或 15m³ (气动开门卸料) |
| 操作模式 | 全自动工控机 + 手动干预双系统 |
WBZ plants process cement-stabilized soil, lime-stabilized soil, gravel-soil mixtures, fly ash composite stabilized bases, and recycled aggregate mixes for highway and airport base layers.
The WBZ600 achieves a continuous output of 600 m³/h under standard conditions with 5% cement content and normal soil moisture. Output varies with material gradation and moisture content.
The screw conveyor and weighing system achieves cement dosing accuracy of ±1%, meeting Chinese JTG/T F20 highway base stabilization standards.
Yes. Standard equipment includes a dust collection system on the mixer head and cement inlet. A secondary bag filter is available as an option for stricter environmental requirements.
WBZ stationary plants require a reinforced concrete foundation pad. Our engineers provide foundation design drawings based on your soil survey data. Foundation construction typically takes 10–20 days.
Dedicated packaging facility with anti-rust treatment, containerized loading plans, and custom crating for ocean freight — ensuring equipment arrives in perfect condition worldwide.
Your plant is precision-manufactured in our 20,000m² factory, fully tested, then containerized for sea or land freight to your location worldwide.
Our relationship doesn't end at delivery. We provide ongoing technical support, spare parts supply, and remote diagnostics to keep your plant running at peak performance long after commissioning.
WhatsApp, phone, and video call support — our engineers respond within 2 hours
Mixing blades, liners, seals, and wear parts shipped globally within 7 working days
PLC-connected monitoring allows our team to diagnose issues remotely and guide repairs
Engineers dispatched for major maintenance, upgrades, and annual inspections
Tell us your project requirements and we will provide a suitable configuration and quotation.
© 2026 兴业机械 (opens in new tab) 保留所有权利
搜索内容...