Skip to main content
3 моделей

Доступные конфигурации

40 +

Стран с поставками

Доступные модели

Выберите подходящую мощность для ваших проектных требований. 3 моделей

100T Bolted Cement Silo

100T

100T Bolted Cement Silo

100T panel-type bolted cement silo. Designed for ultimate export efficiency—multiple units fit in one 40HC container. Easy on-site bolt assembly, 100% watertight, and includes premium European safety accessories.

Технические спецификации

Сравнение моделей

Серия Rated Storage Capacity Structure Type Silo Diameter Total Height Shipping Solution Environmental Accessories Safety Accessories Anti-Clog Accessories Sealing Materials
100T 100 Tons (Based on bulk cement density)Panel-Type / Bolt-AssembledΦ 3000 mm~ 14,500 mm (Including legs)Packs into 40HC Standard ContainerTop Pulse/Vibration Dust CollectorPressure Relief Valve, Level IndicatorsPneumatic Aeration Pads / VibratorsHigh-Polymer Strips & Industrial Sealant
Bolted Cement Silo
3+

Доступные конфигурации

О Bolted Cement Silo

Создано для проектов по всему миру

Сертификаты ISO 9001 и CE. Каждая установка проходит 100% проверку перед отгрузкой и рассчитана на простой монтаж, надёжную длительную эксплуатацию и оперативную сервисную поддержку более чем в 40 странах.

Batching Accuracy
±0.5%
On-Time Delivery
96%
Как мы работаем

От запроса до пусконаладки

01

Tell us about the project

Share your required output, site conditions, power supply and target budget.

02

Engineering proposal

Our engineers return a plant layout, configuration list and quotation, usually within 24 hours.

03

Contract and production

Production starts on order confirmation; you receive progress photos at every major stage.

04

Factory testing

Every unit is assembled and test-run before shipment, with a written inspection report.

05

Shipping and installation

We handle export documentation and dispatch engineers for on-site installation and commissioning.

06

Training and after-sales

Operator training, spare-parts supply and remote technical support for the life of the plant.

Реальные проекты

Объекты по всему миру

Отзывы клиентов

Что говорят наши клиенты

Ahmed Hassan

Ahmed Hassan

Project Manager

The HZS120 plant has been running 18 hours a day for 2 years. Zero major breakdowns. The control system is incredibly precise, saving us 5% on cement costs.

Robert Chen

Robert Chen

Operations Director

We replaced our old Italian mixers with Xingye's Twin-Shaft JS3000. The mixing homogeneity is identical, but the maintenance cost is 40% lower.

David Osei

David Osei

Site Engineer

Installation was surprisingly fast. The engineers arrived on time and had the 60m³/h plant running in just 10 days. Great training for our local team.

Viktor Petroff

Viktor Petroff

CEO

We need equipment that works in -20°C winters. Xingye's heating system and insulated cladding performed perfectly. A reliable partner for harsh climates.

Get in Touch

Request a Quote

Tell us your capacity needs — we'll recommend the right equipment and send a detailed proposal within 24 hours.

Send Us a Message